Installation of formwork on the 13th floor using a mini-crane
Installation of formwork on the 13th floor using a mini-crane

Installation of the formwork on the 13th floor with the help of mini-crane

About the project

Installation of the formwork on the 13th floor with the help of mini-crane JEKKO SPD360