Наши объекты - Строительство торгового центра, г. Алм-Ата - Алма-Ата
ARLIFT
St. Petersburg, pr. January 9, d. 18, letter A
Английская версия
Наши объекты - Строительство торгового центра, г. Алм-Ата

CONSTRUCTION OF THE SHOPPING CENTER, ALMATY

About the project

Category:
Vacuum grippers
Technic:
VACUUM GRIPPER ARLIFTER SP-4 / SPD-4 (WALL + ROOF)

The vacuum gripping Clad Boy 4 was used to install sandwich panels. That work was a part of the large shopping centerconstruction in Almaty.

Types of works performed by ARLIFT technique:

- horizontal installation of sandwich panels (length 6 meters)

- installation of the roof (length 12 meters).

Work was carried out with in one month.

01/19/2017

Our projects

04/20/2026/
04/16/2026/
04/01/2026/
All projects