INSTALLATION OF AIR TUBE IN GUEDERMES
Object: International Training Center for Special Forces, Gudermes, Chechnya
Type of work: installation of a radius glass
Implementation: the installation of the air tube was carried out by vacuum gripping KAPPEL DSMH2.
The complexity of the project was in:
inaccessibility - the access to the supporting structures was only from within the pipe
characteristics of the radius glass - the circumference of the glasses was 1.58 m, and the height was 5 m.
Due to the inaccessibility of the object and the characteristics of the glass, the capture was carried out from the inside.
The installation of the air tubewas supposed to take five daysaccording to the customer's plans, but the use of professional equipment and the convenience of work allowed to complete the project as soon as possible - in just two days.
Photo (construction of the Center): © Valery Sharifulin / TASS
08/09/2017